1874 Goshen Baptist Church building

The 1874 Goshen Baptist Church, built on the original site after the 1809 meetinghouse was destroyed by fire.

Picture taken 1916 and was AI enhanced

At the end of 1873, a committee of deacons and trustees was appointed to prepare plans and estimate costs for repairing and remodeling the church building, which was then sixty‑four years old. As often happens when major alterations are proposed, differences of opinion soon developed. In an effort to reach a congregational decision, a meeting was scheduled for February 28, 1874.

As members approached the church that day, they were shocked to see smoke pouring from the roof. Working quickly they managed to bring the fire under control, though a large portion of both the roof and ceiling had already been destroyed. Despite their exhaustion and discomfort from being cold and wet, the members held the meeting as planned inside the smoke‑filled building. Providentially, the divisions among them seemed to vanish in the aftermath of the fire, and they voted unanimously to tear down the old building and erect a new one on the same site. Until warmer weather arrived, however, the congregation had no choice but to continue meeting in the damaged structure.

The new building, completed at a cost of $3,200, was fifty percent larger than the old, extending forty‑five feet in length while retaining the original width of thirty feet. It was dedicated at an all‑day meeting on November 25, 1874.

Contact

This field is required.
This field is required.
Send
Reset